This lobby area was a joint effort. Jerry C. worked on the base, Eric, Tony, Tim, Brian, myself worked on the paneling. I worked with Eric for two days on this and on the third floor elevator lobby.
Showing posts with label Main floor lobby elevator. Show all posts
Showing posts with label Main floor lobby elevator. Show all posts
Friday, August 21, 2009
Subscribe to:
Posts (Atom)
