Sunday, September 19, 2010

As you can see we dug a trench so that we could epoxy the rebar in then afterwards we dug out the rest of the area to install the rest of the rebar
on the floor of the new shed.

As you can see Carlos had to put up a temp post(4X8) to ensure the structure above us would hold until we poured the concrete. Carlos is always fun to work with and this time is not different. Look at that expression! Now that is a happy carpenter!

This is a space under the kitchen of our house, and Carlos and I drilled holes into the existing foundation walls of the basement to install rebar so that we could tie more rebar for the new slab that we were getting ready to pour.